日本データセンター建設市場規模、シェア、競争環境、トレンド分析レポート:インフラ別(電気インフラ別、機械インフラ別、一般建設)、ティアタイプ別(ティアI・II、ティアIII、ティアIV)、エンドユーザー別(金融サービス (BFSI)、IT・通信、政府・防衛、ヘルスケア、その他): 2024年から2033年までの機会分析および業界予測

レポートID : ROJP0125428  |  最終更新 : 2025年01月  |  フォーマット :  :   : 

Japan Data Center Construction Market Report - Table of Contents

1. INTRODUCTION

  1. 1.1 Study Assumptions and Market Definition
  2. 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  1. 2.1 Research Framework
  2. 2.2 Secondary Research
  3. 2.3 Primary Research
  4. 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

4.1 Market Overview

4.2 Market Dynamics

4.2.1 Market Drivers

4.2.1.1 Increasing Demand for Digital Services Propel the Growth of the Market

4.2.1.2 Increased Data Center Activities such as Expansions, Mergers and Acquisitions, and Joint Ventures to Boost Market Growth

4.2.2 Market Restraints

  1. 4.2.2.1 Navigating Land Costs and Regulatory Landscapes May Impede the Growth of the Market

4.3 Industry Attractiveness - Porter's Five Forces Analysis

4.3.1 Bargaining Power of Suppliers

4.3.2 Bargaining Power of Consumers

4.3.3 Threat of New Entrants

4.3.4 Threat of Substitutes

4.3.5 Intensity of Competitive Rivalry

4.4 Key US Data Center Construction Statistics

4.4.1 Number of Data Centers in Japan, 2020 and 2023

4.4.2 Data Centers Under Construction in Japan, In MW, 2025-2033

4.4.3 Average Capex and Opex for Japan Data Center Construction

4.4.4 Data Center Power Capacity Absorption in MW, Selected Cities, Japan, 2020 and 2023

4.4.5 Top Capex Spenders on Data Center Infrastructure in Japan

5. MARKET SEGMENTATION

5.1 Market Segmentation

5.1.1 By Infrastructure

5.1.1.1 By Electrical Infrastructure

5.1.1.1.1 Power Distribution Solutions

5.1.1.1.1.1 PDU - Basic & Smart - Metered & Switched Solutions

5.1.1.1.1.2 Transfer Switches

5.1.1.1.1.2.1 Static

5.1.1.1.1.2.2 Automatic (ATS)

5.1.1.1.1.3 Switchgear

5.1.1.1.1.3.1 Low-voltage

5.1.1.1.1.3.2 Medium-voltage

5.1.1.1.1.4 Power Panels and Components

5.1.1.1.1.5 Other Power Distribution Solutions

5.1.1.1.2 Power Back-up Solutions

5.1.1.1.2.1 UPS

5.1.1.1.2.2 Generators

5.1.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance

5.1.1.2 By Mechanical Infrastructure

5.1.1.2.1 Cooling Systems

5.1.1.2.1.1 Immersion Cooling

5.1.1.2.1.2 Direct-to-Chip Cooling

5.1.1.2.1.3 Rear Door Heat Exchanger

5.1.1.2.1.4 In-row and In-rack Cooling

5.1.1.2.1.5 Racks

5.1.1.2.1.6 Other Mechanical Infrastructure

5.1.1.3 General Construction

5.1.2 By Tier Type

5.1.2.1 Tier-I and II

5.1.2.2 Tier-III

5.1.2.3 Tier-IV

5.1.3 By End User

5.1.3.1 Banking, Financial Services, and Insurance

5.1.3.2 IT and Telecommunications

5.1.3.3 Government and Defense

5.1.3.4 Healthcare

5.1.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

6.1 Company Profiles*

6.1.1 Hibiya Engineering Ltd

6.1.2 Daiwa House Industry Co. Ltd

6.1.3 Obayashi Corporation

6.1.4 Kajima Corporation

6.1.5 Fuji Furukawa Engineering & Construction

6.1.6 Keihanshin Building Co. Ltd

6.1.7 Meiho Facility Works Ltd

6.1.8 SHINRYO CORPORATION

6.1.9 Taisei Corporation

6.1.10 Linesight

7. INVESTMENT ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

9.1 Industries Covered

9.2 Illustrative List of Clients in the Industry

9.3 Our Customized Research Capabilities

Booklet
  • 最終更新 :
    2025年01月
  • 予想年 :
    2025年~2033年
  • 納期 :
    即日から翌営業日

レポート言語: 英語、日本語

   無料サンプルを入手する arrow icn

この無料サンプルには、トレンド分析から推定・予測まで、さまざまなデータが含まれています。

お問い合わせ

  • JAPAN : 03-6899-2648

  • EMAIL : sales@reportocean.co.jp
マルチレポートプラン
必要なレポート数に応じて、カスタマイズされたプランをご提供します.
2024年の予算を無駄にしないでください!
残りの予算を活用して、将来の成功を確かなものにしましょう。

データに基づく貴重な洞察で、2025年を力強くスタートさせてください。